1 |
TAUFIK RACHMAN SUGIARTO |
167011195 |
ANALISA KEBUTUHAN RUANG PARKIR DI RUMAH MAKAN TAHU SUMEDANG KM 50 JALAN POROS BALIKPAPAN SAMARINDA |
2 |
ANDI KURNIAWAN DARMAYANSA |
167011156 |
ANALISIS MODIFIKASI STRUKTUR ATAS LIFT GEDUNG REKTORAT UNIVERSITAS BALIKPAPAN DENGAN STRUKTUR BETON |
3 |
MUHAMMAD HERMANTO MULIA BUDI HATTA |
167011123 |
ANALISA PERHITUNGAN PRODUKTIVITAS ALAT BERAT GALI MUAT (EXCAVATOR) DAN ALAT ANGKUT (DUMPTRUCK) PADA PEKERJAAN PEMATANGAN LAHAN PERUMAHAN GRANDCITY BALIKPAPAN |
4 |
BRIYAN MAIDY KUSUMA |
167011160 |
ANALISIS KEBUTUHAN DAN KETERSEDIAAN AIR BERSIH YANG DILAYANI IPA KAMPUNG BARU PDAM KOTA BALIKPAPAN |
5 |
RIZAL FADILLAH |
167011142 |
ANALISIS SISTEM DRAINASE PADA WILAYAH RAWAN BANJIR KOTA BALIKPAPAN (STUDI KASUS STRAT 4 KECAMATAN BALIKPAPAN UTARA) |
6 |
NURMAN TRI SENO |
167011178 |
EVALUASI TEBAL PERKERASAN KAKU DENGAN METODE AASHTO 1993 DAN METODE BINA MARGA 2017 PADA JALAN TOL BALIKPAPAN-SAMARINDA |
7 |
ANTALIA |
167011122 |
STUDI PEMANFAATAN BATU BARA SEBAGAI BAHAN FILLER UNTUK CAMPURAN PANAS ASPHALT CONCRETE WEARING COURSE (AC-WC) |
8 |
RIA JULIA MADINAH |
167011152 |
ANALISIS PEMANFAATAN BATU BARA SEBAGAI BAHAN FILLER UNTUK CAMPURAN PANAS AC-BC |
9 |
TITI NUR GIARTI |
167011148 |
ANALISIS KINERJA SIMPANG TIGA TAK BERSINYAL KAWASAN PRAPATAN KOTA BALIKPAPAN |
10 |
NADALIA ANGGRAENI |
167011172 |
KARAKTERISTIK CAMPURAN ASPAL PANAS HRS-WC (HOT ROLLED SHEET-WEARING COURSE) DENGAN PENGGANTI GILSONITE SEBAGAI FILLER |
11 |
MUHAMMAD RAHMAD HIDAYAT |
167011177 |
OPTIMALISASI AIR WADUK MANGGAR SESUAI KETERSEDIAAN UNTUK MEMENUHI KEBUTUHAN AIR BERSIH KOTA BALIKPAPAN. |
12 |
EDGAR YOGI HERMAWAN |
167011164 |
APLIKASI METODE TIME COST TRADE OFF PADA PROYEK RENOVASI RUMAH TYPE 150 DI PT. HER 1 BALIKPAPAN |
13 |
PUTRI LIANI |
167011196 |
ANALISA PERENCANAAN STRUKTUR ATAS PADA BANGUNAN GEDUNG (STUDI KASUS DI GEDUNG PERKANTORAN GRAND CITY BALIKPAPAN) |
14 |
MOHAMMAD ANDI AYYUBI |
167011189 |
Optimalisasi Pelaksanaan Proyek Peningkatan Jalan Menggunakan Metode Time Cost Trade Off (TCTO) (Studi Kasus : Peningkatan Jalan Sultan Hasanudin RT. 35 Kelurahan Baru Tengah) |
15 |
VIKI YOGA ARDI PRATAMA |
167011208 |
ANALISIS PADA STRUKTUR KERANGKA BAJA LIFT DI GEDUNG REKTORAT UNIVERSITAS BALIKPAPAN |
16 |
MUHAMMAD UMAR HADINOTO |
167011147 |
ANALISIS PENGGUNAAN PASIR LAUT SEBAGAI AGREGAT HALUS TERHADAP KUAT TEKAN BETON (STUDI KASUS : PASIR PANTAI MANGGAR, KOTA BALIKPAPAN) |
17 |
PRILLY ANANDA RAHTAMA |
167011149 |
OPTIMALISASI WAKTU DAN BIAYA PADA PROYEK PEMBANGUNAN WORKSHOP DENGAN METODE TIME COST TRADE OFF (TCTO) (STUDI KASUS DI PEMBANGUNAN WORKSHOP PERALATAN ASPHALT MIXING PLANT MINI BANDAR UDARA SULTAN AJI MUHAMMAD SULAIMAN BALIKPAPAN) |
18 |
UBAIYDILLAH |
167011146 |
ANALISIS NILAI CALIFORNIA BEARING RATIO MATERIAL GRANULAR DENGAN TANAH GALIAN C |
19 |
JEZIO BAYU PRASETYO |
167011182 |
Analisis Model Bangkitan Perjalanan Di Permukiman Gang Mawar Kelurahan Sepinggan Raya Kota Balikpapan |
20 |
LOIS |
167011134 |
EVALUASI PEMBANGUNAN PROYEK PERUMAHAN DENGAN METODE PDM DAN PERT (STUDI KASUS DI PERUMAHAN GRAND CITY BALIKPAPAN) |
21 |
SARISNA |
167011174 |
ANALISA OPTIMALISASI PELAKSANAAN PROYEK DENGAN METODE TCTO (STUDI KASUS REHABILITASI PASAR BASAH SEPINGGAN-BALIKPAPAN) |
22 |
RENO ARIEF KURNIAWAN |
167011176 |
ANALISIS KEBUTUHAN AIR BERSIH IPA KM. 12 WADUK MANGGAR PDAM BALIKPAPAN |
23 |
NOVIA SUSANTI |
167011117 |
ANALISA PEMANFAATAN ZAT ADITIF PADA CAMPURAN BETON F'C 45 MPA (STUDI KASUS: PENGECORAN PYLON PADA PROYEK PEMBANGUNAN JEMBATAN PULAU BALANG, KALIMANTAN TIMUR) |
24 |
GITA PUTRI SUGANDHI |
167011133 |
ANALISIS PENGARUH PENERAPAN KESELAMATAN KESEHATAN KERJA TERHADAP PRODUKTIVITAS KERJA KARYAWAN PT. PLN (PERSERO) UNIT LAYANAN PUSAT LISTRIK BATAKAN |
25 |
NUR HIKMAH |
167011181 |
ANALISA JADWAL PELAKSANAAN PROYEK DENGAN METODE CPM&PERT ( STUDI KASUS: PEMBANGUNAN DRAINASE RT.39 KELURAHAN SEPINGGAN) |
26 |
ANISA SETIADI |
167011202 |
EVALUASI MANAJEMEN WAKTU PROYEK MENGGUNAKAN METODE CPM DAN PERT PADA PEMBANGUNAN GEDUNG (STUDI KASUS: PENAMBAHAN RUANG KELAS SMPN 11 BALIKPAPAN) |
27 |
KHAFID FIRDAUS |
167011127 |
ANALISIS BIAYA DAN WAKTU DENGAN METODE EARNED VALUE ANALYSIS PADA PROYEK DRAINASE (STUDI KASUS : DRAINASE JALAN SOMBER OLEH CV. MITRA PRATAMA) |
28 |
MUSTAKIM |
131067011010833 |
Analisis Kapasitas Pondasi Tiang Pancang pada Pembangunan Ruko Kilometer 15 Kota Balikpapan |
29 |
LEONID RAFOWI |
167011140 |
ANALISIS KINERJA ARUS LALU LINTAS SIMPANG TIGA TAK BERSINYAL (STUDI KASUS SIMPANG TIGA GRANDCITY - SOEKARNO HATTA KM 7 KOTA BALIKPAPAN) |
30 |
MEGA OKTAVIA CAHYANI |
167011210 |
ANALISIS DAYA DUKUNG PONDASI BORED PILE PADA JEMBATAN TOL BALIKPAPAN - SAMARINDA (STUDI KASUS: KM.8 STA 2 + 875) |
31 |
NURUL QOMARIAH |
167011199 |
ANALISIS DAYA DUKUNG PONDASI SPUN PILE PADA PELAKSANAAN PROYEK JEMBATAN UTAMA DUA JALAN TOL BALIKPAPAN - SAMARINDA STA : 13+900 |
32 |
LUCKY EKA WANDIRA |
167011179 |
ANALISIS BIAYA PEMBANGUNAN RUMAH TYPE 123/135 DI PERUMAHAN KAIZEN TOWN HOUSE |
33 |
MAYANG SARI |
167011214 |
ANALISIS KEBUTUHAN LAHAN PARKIR (STUDI KASUS RSUD RATU AJI PUTRI BOTUNG) |
34 |
RUDI WIBOWO |
131067011010862 |
Analisis Karakteristik Dan Kebutuhan Lahan Parkir Pada Hotel Platinum Balikpapan |
35 |
ARIES SETIAWAN |
131067011010835 |
ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PEMILIHAN MODA TRANSPORTASI PADA PEGAWAI KANTOR PENCARIAN DAN PERTOLONGAN BALIKPAPAN |
36 |
ALIFAH ERSA WIDYANINGRUM |
167011145 |
PENGENDALIAN BIAYA DAN WAKTU TERPADU PADA PROYEK PEMBANGUNAN GEDUNG ARSIP KANTOR BPN DENGAN METODE EVA (EARNED VALUE ANALYSIS) |
37 |
RIZKI TRIANTO |
167011143 |
ANALISIS KINERJA PROYEK REHABILITASI PASAR BASAH DENGAN METODE EARNED VALUE ANALYSIS (STUDI KASUS DI PROYEK REHABILITASI PASAR BASAH SEPINGGAN-BALIKPAPAN) |
38 |
DWI ADE PUTRA |
167011141 |
ANALISA TINGKAT KEPUASAN PELANGGAN TERHADAP KUALITAS BANGUNAN BERDASARKAN HASIL MATRIX IMPORTANCE PERFORMANCE ANALYSIS (IPA) (Studi Kasus di Perumahan Pelangi Metro Residence Blok G) |
39 |
YAYAN FEBRIANTO |
167011207 |
EVALUASI PROYEK REHABILITASI PASAR METODE PDM DAN PERT (Studi Kasus di Proyek Rehabilitasi Pasar Basah Sepinggan Kota Balikpapan) |
40 |
RIZKY SEPTIAWAN SIGAR |
167011135 |
ANALISIS PERCEPATAN PROYEK MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK JALAN TOL (STUDI KASUS: PROYEK JALAN TOL BALIKPAPAN-SAMARINDA SECTION 5b STA 9+650 - STA 9+850 PT. WIJAYA KARYA) |
41 |
AJI WAHYU PAMBUDI |
167011115 |
ANALISIS WAKTU DAN BIAYA DENGAN METODE EARNED VALUE ANALYSIS (STUDI KASUS PROYEK PEKERJAAN OVERLAY RUNWAY BANDAR UDARA SYAMSUDIN NOOR BANJARMASIN) |
42 |
RIAN FAUZI |
167011124 |
EVALUASI DAN OPTIMALISASI INSTALASI PENGOLAHAN AIR MINUM PDAM KOTA BALIKPAPAN (STUDI KASUS IPAM ZAM PRIMA BALIKPAPAN) |
43 |
SAVERO IMANSYAH DUNGGA |
167011157 |
ANALISIS PEKERJAAN PROYEK PENAMBAHAN FASILITAS RUANG KELAS SDN 033 BALIKPAPAN UTARA DENGAN METODE TIME COST TRADE OFF (TCTO) |
44 |
FITRA RANU PRATAMA |
167011119 |
OPTIMASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF (TCTO) PADA PROYEK PENAMBAHAN BANGUNAN PASAR RAKYAT KM.12 KARANG JOANG BALIKPAPAN |
45 |
PARJIHAN TAUFIK RACHMADI |
167011118 |
ANALISIS BIAYA DAN WAKTU MENGGUNAKAN METODE EARNED VALUE ANALYSIS PADA PROYEK OFFICE |
46 |
MURSYIDUR RIZAL |
147010944 |
ANALISA KARAKTERISTIK PARKIR DI RUMAH SAKIT UMUM DAERAH (RSUD) AJI BATARA AGUNG DEWA SAKTI SAMBOJA |
47 |
DAUD RICHARD IMANUEL |
157011110 |
Evaluasi Pekerjaan Proyek Penanganan Bencana Longsor Kelurahan Muara Rapak Gang Putingan dengan Metode CPM dan Pert |
48 |
PATIMAH |
167011173 |
PENELITIAN PERENCANAAN CAMPURAN ASPAL BETON AC-WC (ASPHALT CONCRETE-WEARING COURSE) DENGAN MEMANFAATKAN ENDAPAN SEDIMEN AIR PDAM SEBAGAI BAHAN FILLER |
49 |
DAEGAL OREA P.P |
131067011010779 |
Korelasi Nilai CBR Lapangan dan CBR Laboratorium Untuk Lapisan Subgrade Project EPC Re- Route PT. Pertamina RDMP Refinery Unit V - Balikpapan |
50 |
FEBY WIJAYANI |
157011085 |
Analisis Kinerja Lalu Lintas Ruas Jalan Yos Sudarso Pelabuhan Semayang Balikpapan |
51 |
ARDIANSYAH |
167011223 |
EVALUASI PENGEMBANGAN JALAN DI PENAJAM PASER UTARA MENGGUNAKAN RIGID (BETON) |
52 |
THARRA ULFA |
167011159 |
ANALISIS DAMPAK LALU LINTAS (ANDALALIN) PEMBANGUNAN DEPO KONTAINER, KANTOR, WORKSHOP, PERGUDANGAN DAN LOGISTIC BERIKAT DI JL. PENDEKAT KIK |
53 |
PIERE DOLUDEA |
167011137 |
ANALISA TINGKAT KEBISINGAN AKIBAT AKTIVITAS TRANSPORTASI DI KAWASAN PENDIDIKAN (STUDI KASUS DI SDN 002 JALAN AHMAD YANI BALIKPAPAN TENGAH) |
54 |
LUKMAN HAKIM |
167011138 |
OPTIMALISASI BIAYA DAN WAKTU DENGAN METODE TCTO PEMBANGUNAN RUANG KELAS BARU (RKB) (STUDI KASUS: SD NEGERI 003 KAMPUNG BARU TENGAH BALIKPAPAN) |
55 |
ADHITYA NUR RIZKI |
167011218 |
ANALISIS JADWAL PELAKSANAAN PEKERJAAN DENGAN METODE PDM DAN PERT (STUDI KASUS : SITE DEVELOPMENT LAWE LAWE TERMINAL FACILITY PROYEK RDMP RU V BALIKPAPAN) |
56 |
ESTER MUTIN |
167011217 |
RESPON MASYARAKAT TERHADAP PENGGUNA ZEBRA CROSS DI KOTA BALIKPAPAN |
57 |
SIDIQ PANGESTU |
167011125 |
ANALISIS BIAYA DAN WAKTU DENGAN METODE EARNED VALUE ANALYSIS (EVA) PADA PROYEK PEKERJAAN SITE DEVELOPMENT KANTOR PERTANAHAN |
58 |
YUDHA SUHADA |
167011128 |
OPTIMALISASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF (TCTO) PADA PROYEK DRAINASE |
59 |
INDRA DARMAWAN |
167011155 |
ANALISA WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF (TCTO) PADA PROYEK PEMBANGUNAN SALURAN DRAINASE RT. 16 KEL. DAMAI BARU |
60 |
FADLIA ULFA |
167011219 |
ANALISA WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF (TCTO) PADA WAREHOUSE SCAFFOLDING STUDI KASUS : PROYEK PEMBANGUNAN WORKSHOP DAN WAREHOUSE RDMP RU V BALIKPAPAN |
61 |
BAGAS PRATAMA |
167011198 |
ANALISA PERCEPATAN WAKTU PROYEK DENGAN METODE CPM (Critical Path Method) (STUDI KASUS: PROYEK RUMAH TIPE 63 KALIANDRA VILLAGE) |
62 |
MUHAMMAD PUTRA SYAHRANI |
167011220 |
ANALISA PERENCANAAN DINDING PENAHAN TANAH STUDI KASUS PROYEK PEMBANGUNAN JEMBATAN PULAU BALANG II |
63 |
HERU WIRANATA LUKOW |
167011150 |
ANALISA ARUS KENDARAAN BERAT TERHADAP KEMACETAN LALU LINTAS SIMPANG KM. 5,5 KARIANGAU |
64 |
VERDICT SUMA WALTAHANAM |
157011004 |
EVALUASI PELAKSANAAN PEMBANGUNAN EMBUNG AJI RADEN BALIKPAPAN DENGAN METODE CPM DAN PERT |
65 |
IMRON SETIADI |
167011201 |
ANALISA WAKTU DAN BIAYA MENGGUNAKAN METODE CPM DAN PERT STUDI KASUS PROYEK PENINGKATAN JALAN DAN DRAINASE KAWASAN GUNUNG SARI ILIR BALIKPAPAN |
66 |
RANO SUSANDI |
187011358 |
ANALISIS MANAJEMEN RESIKO KESELAMATAN DAN KESEHATAN KERJA (K3) KONSTRUKSI MELALUI METODE HIRA Studi Kasus: Proyek Drilling Campaign South Area Anjungan Lepas Pantai Seturian di Wilayah Kerja PT. Pertamina Hulu Kalimantan Timur |
67 |
ESKA CAHYA NODUA (TRF) |
187011359 |
ANALISIS KONDISI PAVEMENT RUNWAY BANDARA SULTAN AJI MUHAMMAD SULAIMAN SEPINGGAN BALIKPAPAN |
68 |
CENRI PALI |
167011192 |
OPTIMALISASI BIAYA DAN WAKTU DENGAN METODE TIME COST TRADE OFF (TCTO) PADA PROYEK PEMBANGUNAN LIFT UNIVERSITAS BALIKPAPAN) |
69 |
FADHIL ALFAJRI |
167011151 |
ANALISIS PERBANDINGAN BIAYA PELAKSANAAN PEKERJAAN BEKISTING KNOCK DOWN PADA BANGUNAN GEDUNG (STUDI KASUS: GEDUNG KANKER, RSUD Dr. KANUJOSO DJATIWIBOWO) |
70 |
MUHAMMAD AFGIR ARSHANDY |
167011175 |
ANALISIS PENGGUNAAN GILSONITE FILLER TERHADAP CAMPURAN ASPAL PANAS HRS-WC (HOT ROLLED SHEET-WEARING COURSE) PADA AIR GENANGAN DAN AIR LAUT |
71 |
RACHMAT SANGGAM PRAWIRANEGARA |
167011132 |
PEMANFAATAN PASIR LOKAL SUNGAI TERIK SEBAGAI BAHAN KONSTRUKSI JALAN |
72 |
MAKMUR |
187011385 |
ANALISA PERHITUNGAN STRUKTUR GEDUNG APARTEMEN VIDA VIEW MAKASSAR |
73 |
BIMA KUNCARA |
147010954 |
ANALISA BIAYA OPERASIONAL CUT AND FILL MENGGUNAKAN EXCAVATOR, DUMP TRUCK DAN DOZER (STUDI KASUS: WORKSHOP PT. MUPECO JLN. PULAU BALANG KM 13 KEL. KARANG JOANG) |
74 |
AGUM REZKI WICAKSANA |
167011170 |
ANALISA DAYA DUKUNG TIANG PANCANG PADA AREA GATE TOL SAMBOJA |
75 |
ANGGA GIGIH PRAYITNO |
167011169 |
ANALISA KEBUTUHAN LAHAN PARKIR PADA RUMAH SAKIT HERMINA BALIKPAPAN |
76 |
TRI WIDIYANTO |
167011116 |
ANALISA KELAYAKAN INVESTASI PEMBANGUNAN PROYEK PERUMAHAN BERDASARKAN ASPEK KEUANGAN (STUDI KASUS: PERUMAHAN NIRMALA RESIDENCE BALIKPAPAN) |
77 |
MOH.DIDIN WIRATNO |
167011130 |
ANALISIS STRUKTUR KOLOM KING CROSS DENGAN KOLOM WF (WIDE FLANGE) PADA SKYBRIDGE PENGHUBUNG PLAZA MALL DAN BRANDED MALL BORNEO BAY CITY - BALIKPAPAN |
78 |
ANDI ADAM MAULANA |
167011200 |
ANALISIS PERCEPATAN BIAYA DAN WAKTU DENGAN MENGGUNAKAN METODE CPM (CRITICAL PATH METHOD) (STUDI KASUS RUMAH TYPE 80 PERUMAHAN KAIZEN TOWN HOUSE BALIKPAPAN) |
79 |
SURYA CANDRA GUNAWAN |
167011188 |
ANALISIS PERCEPATAN PEMBANGUNAN RUMAH TIPE 119 PERUMAHAN PERMATA GADING BALIKPAPAN MENGGUNAKAN CPM |
80 |
SUBEKTI |
167011224 |
PERENCANAAN STRUKTUR GEDUNG 6 LANTAI SMK NEGERI 07 BALIKPAPAN |
81 |
MIFTAKHUL FAHMI ZARKAHFI |
167011209 |
ANALISIS STABILISASI TANAH LEMPUNG LUNAK MENGGUNAKAN MATERIAL SEMEN SEBAGAI CAMPURAN |
82 |
NUR RIZKI FITRIANI AWALIA |
167011221 |
ANALISIS KEKUATAN PONDASI TIANG PANCANG PADA GEDUNG RUKO PT. ASTAPRIMA RAYA BERDASARKAN TES SONDIR |
83 |
AULIA RAHMAN |
167011183 |
ANALISIS SENSITIVITAS KETERLAMBATAN DURASI PROYEK DENGAN METODE PDM (STUDI KASUS : JEMBATAN PERUMAHAN KALIANDRA VILLAGE) |
84 |
RISKI RACHMAWATI AFRIANI |
167011180 |
EVALUASI PENJADWALAN PROYEK DENGAN METODE PDM DAN PERT (STUDI KASUS: APRON - HANGGAR BANDARA SAMS SEPINGGAN) |
85 |
ANDREAS FRISETIADO |
167011139 |
OPTIMALISASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF (TCTO ) PADA PROYEK RENOVASI RUANGAN KANTOR HSSE |
86 |
MUHAMAD BAYU SAPUTRA |
167011131 |
ANALISIS OPTIMALISASI WAKTU DAN BIAYA PADA PROYEK PENINGKATAN JALAN DENGAN METODE TCTO DAN PDM (STUDI KASUS PENINGKATAN JALAN SEPINGGAN BARU SAMPAI DENGAN TRANS AD KOTA BALIKPAPAN) |
87 |
MUHAMMAD RIANDATAMA |
167011121 |
KAJIAN STRUKTUR BAJA SEBAGAI ALTERNATIF REVIEW DESIGN STRUKTUR BETON BERTULANG (STUDI KASUS DI GEDUNG MAKO POLRES BALIKPAPAN-KALIMANTAN TIMUR) |
88 |
MUHTADI |
167011212 |
ANALISIS KARAKTERISTIK KEBUTUHAN LAHAN PARKIR PADA AREA RESTAURANT KFC BALIKPAPAN |
89 |
ISRAN |
167011165 |
ANALISA KEBUTUHAN LAHAN PARKIR DI RESTORAN PIZZA HUT BALIKPAPAN |
90 |
JULIAN NUR SHOLEHA |
167011120 |
ANALISIS PERTUKARAN WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF (TCTO) PADA PROYEK PEKERJAAN REHABILITASI PASAR (STUDI KASUS DI PASAR PANDANSARI LANTAI II DAN LANTAI III BALIKPAPAN) |
91 |
WAHYU MULYO SAPUTRO |
167011190 |
PENGGUNAAN KEMBALI TANAH DISPOSAL SEBAGAI MATERIAL DALAM PEKERJAAN URUNGAN BERBUTIR GRANULAR BACKFILL |
92 |
NELDI JULIAN SAPUTRA |
167011154 |
STUDI KELAYAKAN BATU BAJA SEBAGAI PENGGANTI AGGREGAT KASAR PADA PERKERASAN LENTUR (STUDI KASUS BATU BAJA KALSEL) |
93 |
MEDY SAHRONI |
131067011010850 |
Analisa Kinerja Arus Lalu Lintas Simpang Tiga Tak Bersiyal (Studi Kasus Wolter Monginsidih Balikpapan) |