1 |
IQBAL FAHRUZI RACHMAN |
167011197 |
ANALISA HAMBATAN SAMPING PADA KAWASAN MELAWAI KOTA BALIKPAPAN |
2 |
ANDRI YURI PRATAMA |
177011282 |
ANALISA TINGKAT PELAYANAN FASILITAS PEJALAN KAKI DI PELABUHAN SEMAYANG BALIKPAPAN |
3 |
NAULIA FAHMI |
187011338 |
ANALISIS KETERLAMBATAN PROYEK MENGGUNAKAN METODE TIME COST TRADE OFF (TCTO) (STUDI KASUS DI PEMBANGUNAN JEMBATAN BAKUNGAN, KAB. KUTAI KARTANEGARA) |
4 |
LUSI RAHMANIAH |
187011354 |
ANALISIS PERATAAN JUMLAH TENAGA KERJA PADA PROYEK REHABILITASI SEKOLAH MENGGUNAKAN MS PROJECT (STUDI KASUS PADA PROYEK REHABILITASI SEKOLAH SYARIKAT ISLAM MADINATUL IMAN BALIKPAPAN) |
5 |
INDAH ARISTA ORDELIA |
187011365 |
ANALISA HARGA DENGAN MENGGUNAKAN METODE AHSP PADA PROYEK DRAINASE SEKUNDER GRAHA INDAH BALIKPAPAN |
6 |
HELDA |
187011332 |
ANALISIS PERCEPATAN PROYEK DENGAN METODE TIME COST TRADE OFF (TCTO) PADA PEKERJAAN PRESERVASI JALAN MAYOR (STUDI KASUS DI KUARO-KERANG, KALIMANTAN TIMUR) |
7 |
AGATHA RAMA SANJAYA |
187011327 |
ANALISIS PENGARUH SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) SERTA RISK MANAGEMENT TERHADAP KINERJA PELAKSANAAN PROYEK KONSTRUKSI PADA MASA PANDEMI COVID-19 |
8 |
SUMIANTO AGUS ARITONANG |
187011388 |
MENENTUKAN TEBAL PERKERASAN LENTUR DENGAN METODE ANALISA KOMPONEN |
9 |
AMIN AFANDI |
207011577 |
ANALISA BIAYA DAN WAKTU PADA PEKERJAAN DINDING PENAHAN TANAH DENGAN MENGGUNAKAN BATU BRONJONG DAN BETON RINGAN |
10 |
DJERI SATRIA NUGRAHA |
187011352 |
ANALISA DESAIN WAKTU TRAFFIC LIGHT PADA SIMPANG MT. HARYONO DI KOTA BALIKPAPAN |
11 |
FAJAR AGUNG RUSFENDI |
187011372 |
ANALISIS PERCEPATAN WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN WORKSHOP (STUDI KASUS PEMBANGUNAN WORKSHOP ALAT BERAT, KOTA BALIKPAPAN) |
12 |
JUNAIDI |
187011377 |
ANALISIS PERBANDINGAN DAYA DUKUNG FONDASI SPUN PILE BERDASARKAN HASIL UJI SPT DAN KALENDERING |
13 |
RANI FATIMAH AZZAHRA |
187011371 |
ANALISA PERBANDINGAN KUALITAS ANTARA ASPAL AC-WC KONVENSIONAL DENGAN ASPAL AC-WCnr (NATURAL RUBBER) |
14 |
ARSYA PRAMESTI |
187011389 |
ANALISIS PEMERATAAN SUMBER DAYA TENAGA KERJA (RESOURCE LEVELLING) STUDI KASUS DI PROYEK PERSIAPAN LAHAN WORKSHOP PT. ALTRAK KM.13 BALIKPAPAN |
15 |
ADELLA MUTIARA KALAM |
187011333 |
ANALISIS PENJADWALAN ULANG RENOVASI KLINIK KORPRI DENGAN METODE PERATAAN TENAGA KERJA (STUDI KASUS PROYEK RENOVASI KLINIK KORPRI SEPINGGAN BARU BALIKPAPAN) |
16 |
GUNAWAN EDDY SAPUTRO |
187011347 |
ANALISIS KEBUTUHAN RUANG PARKIR PADA KANTOR CABANG DINAS PENDIDIKAN WILAYAH I |
17 |
NURUL FITRIYANI |
187011370 |
STUDI ANALISIS BIOSEMENTASI TANAH LATERIT UNTUK MENINGKATKAN NILAI CALIFORNIA BEARING RATIO |
18 |
LISSA FEBRIYANTI |
187011335 |
ANALISIS PERBANDINGAN WAKTU DAN BIAYA MENGGUNAKAN METODE TCTO (STUDI KASUS PROYEK RENOVASI KLINIK KORPRI SEPINGGAN BARU BALIKPAPAN) |
19 |
CAHAYA NURUL AZIZAH |
187011369 |
PENERAPAN METODE PDM DAN PERT PADA PROYEK PEMBANGUNAN SALURAN PEMBUANG JALAN PARIWISATA SALOLOANG KECAMATAN PENAJAM' |
20 |
WAHYU CAKRA WIJAYA |
187011364 |
ANALISIS PERBANDINGAN BIAYA MATERIAL ASPHALT HOTMIX PETANGIS DAN PALU PADA PEKERJAAN PELEBARAN JALAN (REHAP MAYOR) |
21 |
MUHAMMAD ZAINUL ARIFIN |
177011273 |
TINGKAT PELAYANAN FASILITAS PEJALAN KAKI KHUSUS TROTOAR KAWASAN PASAR KLANDASAN (STUDI KASUS JL. JENDERAL SUDIRMAN, KOTA BALIKPAPAN) |
22 |
DWI ANGGREINY FARADITA |
157011067 |
Pengaruh Kuat Tekan Beton Dengan Kombinasi Agregat Kasar Alindau 30 % Dan Agregat Kasar Lolli 70 % |
23 |
JIDDAN AULIA |
187011343 |
ANALISIS BIAYA PERALATAN KESELAMATAN DAN KESEHATAN KERJA (STUDI KASUS : PROYEK DOK APUNG PT. DOK PERKAPALAN KALTIM) |
24 |
DIVA AFIFAH HAKIM |
187011362 |
PENGUKURAN KEPUASAN KONTRAKTOR TERHADAP KINERJA KLIEN PADA PROYEK KONSTRUKSI PEMERINTAH |
25 |
DESMON FAJRIN |
187011330 |
PENGARUH BIOSEMENTASI TANAH LEMPUNG TERHADAP NILAI UNCONFINED COMPRESSION STRENGTH (UCS) |
26 |
KLINARDI SULUH ADI YUNARKO |
187011331 |
ANALISIS PERHITUNGAN TEBAL PERKERASAN TERMINAL PETIKEMAS PT. KALTIM KARIANGAU TERMINAL BALIKPAPAN |
27 |
RIAN TAKA PUTRA |
187011323 |
ANALISIS SISTEM SALURAN DRAINASE TERBUKA DI SEPANJANG RUNWAY DI BANDAR UDARA SULTAN AJI MUHAMMAD SULAIMAN SEPINGGAN BALIKPAPAN |
28 |
MUHAMMAD YUSRAN |
187011325 |
PERENCANAAN SISTEM DRAINASE PADA KAWASAN PERUMAHAN GRAHA INDAH BALIKPAPAN |
29 |
AHMAD SABARANI |
187011382 |
ANALISIS PRODUKTIVTAS ASPHALT MIXING PLANT PETANGIS PT. BUMI KARSA (STUDI KASUS : PRESERVASI JALAN KERANG (BTS. KOTA PROV. KALSEL) - BTS. KOTA TANAH GROGOT) - LOLO - KUARO KALTIM) |
30 |
DEDY PRASETYO |
177011269 |
ANALISIS RANTAI PASOK MATERIAL MINI PILE 5 JALAN TOL BALIKPAPAN - SAMARINDA SEKSI 5 |
31 |
AHMAD RIPANI |
187011341 |
ANALISIS DINDING PENAHAN TANAH TIPE CANTILEVER TERHADAP PENGARUH STABILITAS GESER DAN STABILITAS GULING |
32 |
RIO PUTRA RAMADHAN |
187011322 |
Pengaruh Biosementasi Tanah Gambut Terhadap Nilai Unconfined Compression Strength (UCS) |
33 |
MUHAMMAD IHSAN |
187011329 |
PENGARUH KUAT TEKAN BETON MUTU K-350 MENGGUNAKAN KOMBINASI AGREGAT KASAR DENGAN PERBEDAAN KARAKTERISTIK |
34 |
WINDY OCTAVIA |
167011184 |
ANALISIS DAYA DUKUNG SUBGRADE PADA RUAS JALAN TAMBANG PT. SIMS JAYA KALTIM SITE KIDECO JAYA AGUNG STA 0-1500 - 0+400 |
35 |
ADI MUHAMMAD RIDHO PAMUNGKAS |
187011378 |
ANALISIS PENJADWALAN PROYEK REHABILITASI JALAN MENGGUNAKAN METODE PDM DAN PERT (STUDI KASUS DI KEGIATAN PRESERVASI JALAN KERANG-KUARO, KALIMANTAN TIMUR) |
36 |
HENDI EKA SAPUTRA |
187011353 |
PENGARUH KUAT TEKAN BETON MUTU K-300 MENGGUNAKAN KOMBINASI AGREGAT KASAR DENGAN PERBEDAAN KARAKTERISTIK |
37 |
ELSA LINTIN |
187011346 |
ANALISIS PRODUKTIFITAS DAN EFISIENSI ALAT BERAT PADA PROYEK KONSTRUKSI (STUDI KASUS PROYEK PEMBANGUNAN KANTOR DINAS LINGKUNGAN HIDUP SAMARINDA) |
38 |
MUHAMMAD TAUFIK FAJAR |
187011350 |
PENGARUH BIOSEMENTASI TANAH GAMBUT TERHADAP NILAI CALIFORNIA BEARING RATIO (CBR) BALIKPAPAN |
39 |
VIKA DWI SETIOWATI |
187011366 |
OPTIMASI BIAYA DAN WAKTU PADA PROYEK DENGAN METODE TIME COST TRADE OFF (STUDI KASUS : PENYESUAIAN PERMUKAAN APRON DAN PEMBUATAN DRAINASE, BANDARA SULTAN AJI MUHAMMAD SULAIMAN SEPINGGAN BALIKPAPAN |
40 |
DIAN EKA SAFITRI |
187011339 |
Analisis Pengendalian Waktu Dengan Menggunakan Metode PDM dan PERT (Studi Kasus di Proyek Pembangunan Gudang Alat Berat dan Pencucian Alat Berat) |
41 |
DEVI MARDIANA |
187011324 |
ANALISIS PENJADWALAN PROYEK MENGGUNAKAN METODE PDM DAN PERT (STUDI KASUS PROYEK PEMBANGUNAN PUSKESMAS MARGOMULYO, BALIKPAPAN) |
42 |
BENYAMIN ARJULIAN HERO WAYONG |
187011381 |
ANALISA PRODUKTIVITAS DAN EFISIENSI ALAT BERAT EKSKAVATOR (STUDI KASUS PENANGANAN LONGSORAN DI JALAN SYARIFUDDIN YOES KOTA BALIKPAPAN) |
43 |
CHOLIFAH ALIYANI |
187011326 |
ANALISIS TINGKAT PRODUKTIVITAS TENAGA KERJA DI JAM KERJA NORMAL DAN JAM KERJA LEMBUR PADA PROYEK KONSTRUKSI (STUDI KASUS : PROYEK PEMBANGUNAN GEDUNG KANTOR DINAS LINGKUNGAN HIDUP SAMARINDA) |
44 |
NAUFALINDA ATHARI |
187011342 |
ANALISA PERBANDINGAN RENCANA ANGGARAN BIAYA ANTARA METODE AHSP DAN METODE SNI (STUDI KASUS PROYEK RENOVASI KLINIK KORPRI SEPINGGAN BARU BALIKPAPAN) |
45 |
NIKE AGUSTIYANA |
187011363 |
ANALISIS MANAJEMEN RISIKO PADA PROYEK KONSTRUKSI GEDUNG BERTINGKAT DENGAN METODE SEVERITY INDEX (STUDI KASUS PROYEK PEMBANGUNAN KANTOR DINAS LINGKUNGAN HIDUP SAMARINDA) |
46 |
LOREN MAMAHIT, DEWI MEGA |
187011380 |
ANALISIS BIAYA DAN WAKTU DENGAN METODE EARNED VALUE ANALYSIS (EVA) PADA PROYEK SIRING DAN JALAN RT. 32 KARANG JOANG |
47 |
NAUVAL AL HAKIM |
187011337 |
ANALISIS STABILITAS STRUKTUR DINDING PENAHAN TANAH DAN DAYA DUKUNG FONDASI SPUN PILE BERDASARKAN HASIL DATA SPT (Studi Kasus Proyek Longsoran Preservasi Jalan Kerang Ruas VI Kabupaten Paser ) |
48 |
ARIF DWI PUTRANTO |
187011356 |
PENGARUH PENAMBAHAN MIKROORGANISME BACCILUS SUBTILIS PADA TANAH LATERIT PADA NILAI UNCONFINED COMPRESSIVE STRENGHT (UCT) |
49 |
NUR SALSIAH |
187011349 |
PENERAPAN METODE PDM DAN PERT PADA PROYEK REHABILITASI SEKOLAH YAYASAN PENDIDIKAN SYARIKAT ISLAM MADINATUL IMAN KOTA BALIKPAPAN |
50 |
NATASYA AMALIA ISWANTO PUTRI |
187011376 |
ANALISIS RISIKO KECELAKAAN KERJA PADA PROYEK KONSTRUKSI (STUDI KASUS : PROYEK PEMBANGUNAN KANTOR DINAS LINGKUNGAN HIDUP SAMARINDA) |